Consider the Source: University of Virginia Institute for Environmental Negotiation Strategy List

The Mathews County Planning Commission is considering a list of “tools” MPPDC provided as ideas for a county whose goal is “living with the water.” The  MPPDC (Middle Peninsula Planning District) suggestions for Mathews County’s comprehensive plan revision focus more on how not to develop the county’s land resources than any future use planning. There is a heavy emphasis on urban stormwater management which doesn’t fit our rural and relatively undeveloped county.

Our rural stormwater needs are centered on getting the Virginia Department of Transportation to fix its failing state road drainage systems that are flooding private property and woodlands. To their credit,  VDOT seems to be hearing that message and is reaching out to partner with the county in working on the long-neglected problem. But there isn’t one word about VDOT’s drainage issues or the state’s responsibility in the “toolbox.”

The MPPDC tools do include the possibility of creating special hazard districts and Imposing new taxes and stormwater fees, and of course, the pet project of Executive Director Lewie Lawrence, the creation of a Ditching Authority. This would be a regional authority that would decide how much to tax landowners for the maintenance and repair of roadside and outfall ditches that cross their land across the Middle Peninsula. This Authority would act without the counties’ involvement or control if enabling legislation is created to permit its formation.

The basic idea ignores the fact that most of the roadside ditches are within the VDOT right-of-way, and where they’re not, there are easements for them, even though some of these were covered by consent of landowners, some dating back to the late 1800s. Others are included in right-of-way deeds as granting any land necessary “to construct, improve and maintain any drain ditches or other drainage facilities that may be needed for the proper and adequate drainage of said Route.” Also ignored is the fact is the number of outfalls that are natural streams that VDOT excavated. They are still considered streams by the Commonwealth, and landowners are not responsibile for their maintenance.

The MPPDC tools offer at least 11 ways to trade away Mathews land for cash payments or tax credits now that will prevent development here in Mathews forever. Some will allow urban developers to ignore an urban area’s zoning or environmental regulations and mitigate their violations by trading their building or ongoing pollution for unspoiled Mathews land. Transfer of development rights allows the urban over-development and eliminates ours. Polluters can keep polluting and substitute credits for locking in our land from development and paying us for the privilege. This doesn’t do anything to help the Bay. We’re already doing our part to help it recover, but the urban developers can continue to impair and damage it.

Conservation easements can be a good thing, but how do they fit into the County’s future? No one is looking at the long term effects of the MPPDC efforts to gather up these easements, which it can then transfer to other nonprofits. Are they going to become income sources for allowing pollution and overdevelopment elsewhere? That’s not explained in the toolbox list. So where did some of these ideas originate? Following is the 7-page strategy list included in a 2013 report to the legislature. Some of the strategies are sound, but others are being used now as part of the MPPDC toolbox against the best interests of Mathews for the long run.

Carol J. Bova

================================================================

RECURRENT FLOODING STUDY  FOR TIDEWATER  VIRGINIA
This report identifies recurrent flooding issues throughout Tidewater
Virginia, examines predictions for future flooding issues and evaluates a
global set of adaptation strategies for reducing the impact of flood events.

Report submitted to the Virginia General Assembly
January 2013

credit for recurrent flooding

Pages 128-134.  Full document at:

http://ccrm.vims.edu/recurrent_flooding/Recurrent_Flooding_Study_web.pdf

 

Section 4.6 IEN strategy list

The following lists are presented courtesy of the University of Virginia Institute for Environmental Negotiation.

 

Local Government Tools for Addressing Sea Level Rise in Virginia

DRAFT

Planning Tools To Be Considered for Discussion at Focus Groups

Compiled by the University of Virginia Institute for Environmental Negotiation

Sources cited below

January 2012

LAND USE: Examples of tools relating to land use concerns

  1. Update the local Comprehensive Plan to:
    1. Establish the rate of estimated sea level rise and time period over which it may occur.
    2. Designate areas vulnerable to sea level rise.
    3. Site future public infrastructure and capital improvements out of harm’s way.
    4. Provide the scientific basis to justify changes in land use decision-making, including an analysis of likely sea level rise hazards (inundation, flooding, erosion), and vulnerabilities (to specific areas, populations, structures and infrastructure).
    5. Plan responses to sea level rise.1
  1. Using data gathered on potential sea level rise and predicted flooding, update existing or designate new inundation zones or flood plain areas.2
  1. Integrate vulnerability assessments and sea level rise considerations into the locality’s existing Wetlands Ordinance.3
  1. Revise local zoning and permitting ordinances to require that projected sea level rise impacts be addressed to minimize threats to life, property, and public infrastructure and ensure consistency with state and local climate change adaptation plans.4
  1. Use overlay zoning to protect shorelines and other vulnerable areas. Overlay districts could prohibit shoreline protection structures, implement shoreline setbacks, restrict 1 future development, lower non-conforming use thresholds, or raise “free board” building code requirements. Shoreline overlay districts could take the form of either:
    1. A fixed-distance zone along the shoreline that would extend across all existing shoreline zoning districts; or
    2. A variable, resource-based zone, based on a scientific inventory of existing shoreline resources. The zone would vary in distance from the water line according to the identified resources.5
  1. Designate specific thresholds of land disturbance in square footage or acres that trigger a Water Quality Inventory Assessment.6
  1. Under section 15.2-2286 of the Virginia Code, offer tax credits to landowners who agree to voluntarily “downzone” their property.7
  1. Offer Use Value Assessments for owners who preserve shoreline property as open space or Wetlands Tax Exemptions to owners who agree to preserve wetlands and riparian buffers. These strategies are authorized under Virginia Code sections 58.1-3230 and 58.1-3666, respectively.8
  1. Enter into voluntary agreements with landowners to establish “rolling easements” with boundaries that shift as the mean low sea level rises. These would allow landowners to continue with their current land uses until sea level rise actually occurs. At this time, the concept of “rolling easements” is still relatively new.9
  1. Extend Resource Protection Area and Resource Management Areas under the Chesapeake Bay Preservation Act (CBPA) ordinance. These areas can be extended if specific performance criteria that contribute to the stated goals of the CBPA (pollution reduction, erosion and sediment control, stormwater management) are established.10

NATURAL RESOURCES: Examples of tools relating to concerns

1.Prevent the erosion of storm water canals and shoreline by regularly removing trash, vegetation, sands, and other debris.11

  1. Restore prior-converted wetlands to provide storage and filtration and mitigate storm flows and nutrient loading.12
  1. Require new landscaping to incorporate flood and salt-water tolerant species and focus on creating buffers and living shorelines to reduce erosion.13
  1. Continue implementing beach replenishment and nourishment efforts.14
  1. Where possible, adopt shoreline protection policies that encourage the use of living shorelines rather than shoreline hardening.15 Where this is not feasible, protect land and buildings from erosion and flood damage using dikes, seawalls, bulkheads, and other hard structures.16
  1. Encourage shoreline property owners to implement shoreline management practices, including managing marshland and constructing stone sills, breakwater systems, revetments, and spurs.17
  1. Expand the adoption of accepted soil-conservation agricultural management practices to reduce erosion and polluted runoff.18
  1. Institute engineering strategies to mitigate saltwater intrusion into freshwater aquifers, including the construction of subsurface barriers, tide control gates, and artificially recharging aquifers.19
  1. Establish and maintain corridors of contiguous habitat along natural environmental corridors to provide for the migration and local adaptation of species to new environmental conditions.20
  1. Develop a price-based accounting system for ecosystem services.21
  1. Provide local businesses with information on the importance of maintaining the health of shorelines.22 (good voluntary approach if the case can be made “why do this”
  1. Remain aware of the effects that flood mitigation strategies, such as beach replenishment, have on wildlife.23

SAFETY AND WELFARE: Examples of tools relating to safety and welfare concerns

  1. Develop sea level rise action plans for critical local infrastructure. If existing transportation infrastructure is at risk, “develop plans to minimize risks, move infrastructure from vulnerable areas when necessary and feasible, or otherwise reduce vulnerabilities.”24
  1. Implement an early warning system for flooding that would monitor rainfall and water Levels and notify relevant government agencies and the general public in the event of an emergency.25
  1. Improve the ability of local infrastructure to efficiently handle drainage in the event of increased flooding. This could involve minimizing the construction of new impervious surfaces in flood-prone areas.26
  1. Amend existing zoning ordinances to require increased building elevations and setbacks, flood-proofing, and reduced density for new construction within flood zones.27
  1. Improve and enhance traffic rerouting and emergency evacuation protocols related to flooding events.28 (First responders love this stuff)
  1. Ensure that hospitals, evacuation refuge sites, fire and emergency rescue facilities, and key transportation routes are outside of inundation zones or are secured against projected flooding.29
  1. Redirect new infrastructure development away from low-lying neighborhoods and other at-risk areas, and elevate and armor existing critical infrastructure.30
  1. Require private sector owners of infrastructure to conduct sea level rise vulnerability assessments and develop their own sea level rise adaptation plans as a condition for permit approval.31
  1. Encourage the graduated repurposing of structures that are rendered unsuitable for their current use by sea level rise.32,33
  1. Gradually withdraw public services in flooded areas.34, 35

QUALITY OF LIFE: Examples of tools to address quality of life concerns

  1. Involve businesses in the planning process to prevent the loss of shoreline business and to mitigate the impacts of increased flooding and sea level rise.36 (could be a good voluntary strategy for public awareness.)24
  1. Establish a Transfer of Development Rights program to allow the owners of at-risk shoreline properties to sell development rights to upland landowners.37
  1. Permit the use of Onsite Density Transfers, which allow developers to subdivide lots into smaller and denser parcels if they preserve a portion of the lot as open space and cluster the subdivided parcels.38
  1. Purchase flooded property from landowners.39
  1. Organize coastal businesses and homeowners to appeal to insurance companies for affordable rates and deductibles.40
  1. Organize coastal businesses and homeowners to petition local, state, and federal politicians to address sea level rise.41
  1. Require realtors to disclose the threat of sea level rise and the responsibilities of shoreline owners to potential purchasers of shoreline properties.42
  1. Implement special taxing districts that cover the real, life-cycle costs of providing government services in high-risk flood zones, resulting in higher taxes for property-owners in those zones.43
  2. Use a financial regulatory program to discourage increasingly risky investments along the shoreline. Examples of existing programs with similar aims include:
    1. The state regulation of the property loss insurance sector to reflect higher risk from sea level rise, and
    2. Placing conditions on economic development to require the completion of a long-range vision and plan that addresses sea level rise and flood risk.44
  3. Hold a series of meetings with stakeholder groups to discuss and gauge potential sea level rise impacts to the region or locality.45
  1. Educate local elected officials on sea level rise, and the predicted impacts to the region or locality.46
  1. Present data in easily-understood terms, such as X acres will be flooded, X homes lost, and X impacts to wildlife.
  1. Extend media coverage to issues related to sea level rise to increase public awareness and to help citizens prepare for emergencies. This can include the use of social media, such as Facebook, as well as traditional media, including radio, television, and newspapers.48
  1. Increase public outreach, including press conferences, information sessions, community events, public meetings, and exhibits on sea level rise at libraries, aquariums, and museums.49
  2. Using modern technologies such as GIS mapping software, develop education programs for residents as well as students in local and regional schools.50
  1. Educate residents about the role that fertilizing, vegetation removal, and litter play in increasing flooding, erosion, and property damage.51
  1. Provide landowners with accurate data on the current and future vulnerability of their property to sea level rise as well as best managing practices for mitigating the effects of increased flooding.52
  1. Raise public awareness of areas prone to flooding through increased signage.53

OTHER TOOLS to consider

  1. Craft a “Community Resilience” policy statement emphasizing the need for science-based vulnerability assessments, adaptation planning, education and public engagement, and the development of flexible regulatory and non-regulatory strategies for addressing sea level rise.54
  2. Compile a sea level rise impact assessment. This is often a long-term, multi-phase effort. Steps can include:
    1.  Assembling an advisory workgroup.55
    2. Identifying flood zones and at-risk populations.
    3. Mapping regional and county sea level rise predictions to show impacts to existing development and natural areas; and
    4. Assessing and prioritizing economic and ecological vulnerabilities to sea level rise.

===================================

1 Georgetown Climate Center, Stemming the Tide: How Local Governments Can Manage Rising Flood Risks –
Review Draft 3 11 (May 2010), on file with author.
2 See id. at 9-10.
3 Virginia Polytechnic Institute and State University (“Virginia Tech”), Building Resilience to Change: Developing
Climate Adaptation Strategies for Virginia’s Middle Peninsula – DRAFT 16 (October 2011), on file with author.
4 L. Preston Bryant, Jr., Governor’s Commission on Climate Change, Final Report: A Climate Change Action Plan 35
(Dec. 15, 2008), on file with author.

5 Virginia Tech, supra note 2 at 13, 32, 43.
6 Id. at 16.
7 Georgetown Climate Center, supra note 1 at 18.
8 Virginia Tech, supra note 3 at 43.
9 Id. at 36, 43; see also Georgetown Climate Center, supra note 1 at 19-23.
10 Virginia Tech, supra note 1 at 43.
11 Institute for Environmental Negotiation (“IEN”), Sea Level Rise in Hampton Roads: Findings from the Virginia
Beach Listening Sessions, March 30-31, 2011, Final Report 61, available at
http://www.virginia.edu/ien/docs/Sea_Level_Rise%20final%20report%207-19.pdf.
12 Virginia Tech, supra note 3 at 27.

13 IEN, supra note 11 at 57.
14 Id. at 59, 65.
15 See Bryant, supra note 4 at 36.
16 Virginia Tech, supra note 3 at 35.
17 Id. at 42.
18 Id. at 28.
19 Id. at 13.
20 IEN, supra note 11 at 64.
21 Virginia Tech, supra note 3 at 21.
22 IEN, supra note 11 at 61.
23 Id. at 64.

24 Bryant, supra note 4 at 35; see also IEN, supra note 2 at 64-65.
25 See Virginia Tech, supra note 3 at 22.
26 IEN, supra note 11 at 57, 61.
27 Id. at 43; Georgetown Climate Center, supra note 1 at 11.
28 William A. Stiles, “A ‘Toolkit’ for Sea Level Rise Adaptation in Virginia” 4.1.3, on file with author.
29 Id.
30 Id. at 3.1.
31 Bryant, supra note 4 at 35.
32 IEN, supra note 11 at 60.
33 Bryant, supra note 4 at 35.
34 Id. at 81.
35 Bryant, supra note 4 at 35.

36 Id. at 27.
37 Georgetown Climate Center, supra note 1 at 17.
38 Virginia Tech, supra note 3 at 40.
39 IEN, supra note 11 at 81.
40 Id. at 58-59.
41 Id. at 60.
42 Id. at 63.
43 Stiles, supra note 24 at 4.1.2.
44 Id. at 4.1.4.
45 Virginia Tech, supra note 3 at 7-8.
46 Id. at 9. For specific training and funding opportunities, see id. at 44-45; see also IEN, supra note 11 at 67.
47 IEN, supra note 11 at 64.

48 Id. at 66, 68.
49 See id. at 62-63, 66-67.
50 See Virginia Tech, supra note 3 at 45.
51 IEN, supra note 11 at 63.
52 Id. at 59; Bryant, supra note 4 at 37.
53 IEN, supra note 11 at 57.
54 Virginia Tech, supra note 3 at 34.
55 IEN, supra note 11 at 57.

56 Stiles, supra note 24 at 3.1.; Virginia Tech, supra note 3 at 8.
57 See generally Stiles, supra note 24; Virginia Tech, supra note 3 at 2.
58 IEN, supra note 11 at 57.
59 See Stiles, supra note 24 at 4.1.1.
60 Id. at 3.2.

Comments and Concerns Sent to US Army Corps of Engineers

Date:  December 22, 2015

To:      Keith R. Goodwin, keith.r.goodwin@usace.army.mil
CC:      Joe Schumacher, Congressman Wittman’s office
Mathews County Supervisors
RE:      NAO-201501451 Chesapeake Bay Wetland Mitigation Bank

The prospectus for the referenced mitigation bank fails to adequately address issues of public health and safety, potential East River water quality impacts, and conflicts with the Mathews County Comprehensive Plan. A number of responses to the Virginia Off-Site Mitigation Location Guidelines Checklist are factually inaccurate. Contrary to the responses, the riparian areas of the East River are on adjacent properties except for a small fringe of the RMA in the southeastern corner of the site, and a residence is currently under construction on a parcel adjacent to the site. While the risk of lead contamination of the groundwater which connects to the Yorktown-Eastover aquifer, the primary and generally only source of drinking water for Mathews County, is of the utmost concern, consideration of the impacts of reduced water flow to the East River is important to the health of the river and the Chesapeake Bay. The other issues raised here need to be considered as well.
Thank you,
Carol J. Bova

Concern about Lead Contamination of Groundwater and Aquifer

The initial lead remediation plan for the proposed mitigation site on Route 14 will stop unless a subsequent random soil test is higher than 400 ppm, which is equal to 400,000 ppb. The EPA action level for lead in drinking water is 0.15 mg/liter, which equates to 15 parts per billion, yet the remediation plan does not address the possibility of lead leaching into groundwater during the five years of shooting range activity which uses approximately 2,188 pounds of lead shot annually. No water testing is included in the prospectus or lead remediation plan even though the Yorktown-Eastover, the primary aquifer for domestic wells, is 7 feet below the surface of the ground as recorded in the USGS borehole about 1.5 miles southwesterly on Route 14 from the site, and the aquifer is in contact with groundwater in many places.

“The Yorktown-Eastover aquifer and the eastern part of the surficial aquifer are closely associated…and jointly compose a shallow, generally semiconfined groundwater system that is hydraulically separated from the deeper system.” (USGS Professional Paper 1713, Abstract. http://pubs.usgs.gov/pp/2006/1731/pp1731_download.htm)

The National Wetlands Inventory shows 6.28 acres of land designated as temporarily flooded overlaying part of the shooting range fallout zone. This is not shown on the prospectus site map. Even if that area is no longer flooded, the remediation plan does not follow the Technical/Regulatory Guidelines of the Interstate Technology and Regulatory Council regarding runoff. (See page 6–NWI map detail with 5 areas marked where precipitation runoff crossed Honey Pod Lane to the East River in December 2015.)

“Nearby surface waters or wetlands that could be receiving runoff from the areas of the ranges where shot or bullets are deposited should also be noted, and the sampling and analytical plan should investigate this possibility.”                               (http://www.itrcweb.org/GuidanceDocuments/SMART-1.pdf)

Annual rainfall for this area is about 45 inches. The U.S. Army’s report, “Prevention of Lead Migration and Erosion from Small Arms Ranges” discusses effects of saturated soil on corrosion and lead migration with shallow depth to groundwater not addressed in the prospectus.

“Rainfall also influences the solubility of lead. The more rainfall, the greater the likelihood the soil will become saturated, increasing the time the round stays in contact with the rainwater. The longer the round stays in contact with moisture, the faster it will corrode. Acid rain accelerates the corrosion process.

“The risk of lead migration to groundwater becomes greater when the corrosion rate is high and depth to groundwater is shallow (less than 10 feet). Basically, the closer the groundwater is to the surface, the greater the chances of contamination.”  (http://www.aec.army.mil/Portals/3/range/leadmigration.pdf)

According to EPA’s Best Management Practices for shooting range operation, sandy soils, high annual rainfall, and a water body downslope of the range increase the risk of lead migration and contamination. (http://www3.epa.gov/region02/waste/leadshot/epa_bmp.pdf)

Runoff from the proposed site was observed in five locations crossing Honey Pod Lane from west of the site in December 2015 after a moderate amount of rainfall. (See page 6.)

The remediation plan for lead in the soil will not start until 2018 while lead could be leaching into the groundwater or be in runoff to the East River in the five years before then.

Negative Impact of Berms and Blocking Drainage on East River Water Quality

Although the environmental specialist for the sponsor told the Mathews Board of Supervisors on December 15 there would be the same three discharge sites, he also said there will actually be less water coming off the site because of planting trees. “We’re decreasing the flow off the site.” The prospectus describes the plan to raise the site’s groundwater level by blocking the existing drainage channels on the property and building berms which would seem to indicate less water will reach the river from those changes as well.

The East River has two Category 5 impairments on the state’s 2014 303D(1) report which can be worsened by reduced water flow: pH exceedance in 8 of 12 months and low dissolved oxygen. The East River TMDL review is not scheduled until 2024, so any worsening of impairments will impact the Chesapeake Bay water quality at least until that time.

Inaccurate Statement about Fallsington Soil

The prospectus states, “…most of the surrounding property has Fallsington Soils, which are not suitable for drainfields.” This is not an accurate statement because suitability is site-dependent. Fallsington soil is present in much of the County and can be suitable for septic systems. The “User Notes for National Wetlands Inventory Maps of Eastern Virginia” lists the Fallsington Soil Series with an asterisk: “Requires site evaluation to determine whether soil is wetland.” The presence of five homes adjacent to the proposed site and one under construction would also confirm this fact.

A follow up review for the Piankatank/Gwynn’s Island/Milford Haven TMDL IP was made in August 2015 for septic system deficiencies, repairs and replacements in Mathews County, including the East River watershed (Shellfish Growing Area 41), surveyed by the Virginia Health Department, Division of Shellfish Sanitation. Growing Area 41 has 983 homes, and there were 14 septic system repairs over a three-year period (2013-2015), a rate of 1.42 percent and 6 replacements, a rate of 0.61 percent, well below the failure rate used in the Piankatank TMDL Water Quality Improvement Plan.

Although the environmental specialist said at the December 15 meeting there would be no impact on adjacent homeowners from surface flow, neither he nor the prospectus discussed the sub-surface effect on downslope drainfields of raising the water table on the mitigation site which is at a higher elevation. No statements were made as to current depth of groundwater on the mitigation site or adjacent properties.

Comments on Sponsor’s Answers to Off-Site Mitigation Guidelines Checklist

B1. Wetland Restoration: Yes
B2. Stream Restoration: No.

It is questionable whether this is a wetland restoration.

  • “Most of the marshes along the North and East Rivers are fringing marshes along the adjacent uplands…” (Mathews County Shoreline Management Plan, Virginia Institute of Marine Science, Shoreline Studies Program, March 2010.)

There are no marshes on the site which would indicate the site was historically uplands.

Mathews County is a watershed discharge zone for the Chesapeake Bay through its streams, creeks and rivers. Ephemeral streams flow only after rains fall and are rarely indicated on maps. Mining of sand on the site in the 1930’s and farming prior to and after that time would have disrupted the natural ephemeral streams that would have conducted water to the East River, leading to the establishment of drainage ditches on the site.

  • Spot elevations from the National Map show most of the property is about 12 feet in elevation, with one measurement of 14 ft midway down the eastern boundary ditch which runs from state Route 14 to the East River. The site is higher than 2/3s of West Mathews according to the Comprehensive Plan, and it is in Zone X outside the 500-year floodplain. See page 7 for FEMA Flood Hazard Map.

B3. Sponsor states the site is contiguous or connected to other aquatic areas.

  • There is no description of this connection in the prospectus beyond the image of the drainage ditch on the east property line. There is no acknowledgement of the existence of the historically present intermittent stream. See pages 8-9 for adjacent properties between the site and East River.

B4. Sponsor states no existing or proposed development upslope/adjacent to the project.

  • A residence is currently under construction immediately to the west of the project at 166 Honey Pod Lane.

B4. Sponsor also states no areas are identified for future development in the Comprehensive Plan upslope and adjacent to the proposed mitigation site.

  • The Comprehensive Plan designates the upslope northern property border as part of a 300-foot wide Corridor Overlay District along Route 14 and for Waterfront Residential along the west and south borders. See page 10.

B5. Sponsor claims riparian buffer protection greater than state and local requirements.

  • The only riparian buffer may be in a small area within the RMA on the southeastern edge of the property. Any other buffers would be on adjacent properties. See page 11, Comprehensive Plan Chesapeake Bay Protection Areas map. If tree seedlings are able to take hold when planted, it would be a number of years before they can take up any significant amount of water.

B7. Sponsor claims the site is consistent with local planning requirements.

  • In fact, there are no zoning ordinance statements that apply except Section 15.8 which prohibits land use that creates “…noxious, or otherwise objectionable conditions which could adversely affect the surrounding areas or adjoining premises.” Freshwater wetlands without environmental conditions that allow wet/dry cycles to keep soil oxygenated produce methane and can produce hydrogen sulfide. The environmental specialist James Hudson told the Board of Supervisors on December 15 there would be standing water above the surface in the winter wet season.
  • The following excerpt from class notes from the University of Arizona’s College of Agriculture and Life Sciences describes wetlands methane production.

Nutrient cycling in wetlands:

“The diffusion of oxygen in saturated soils is 10,000 times slower than in unsaturated soils. A saturated soil will become anaerobic in a matter of hours (matter of days at most) depending on 1) temperate; 2) the amount of organic matter; 3) the initial microbial community and 4) the amount of reducing compounds present (example: ferrous iron)….Methanogenic [methane-producing] organisms work in the anaerobic zone to convert dissolved organic carbon into methane…..The production of methane is much more common in freshwater systems.”                                                     (http://cals.arizona.edu/azaqua/aquaplants/classnotes/NutrientCycling.pdf)

B8. Sponsor states order of stream on site is not applicable.

  • An intermittent first-order stream is clearly shown running to the south through the shooting range fallout zone on USGS 1948, 1965, and 2013 topographic maps, the National Map, and Mathews County Tax Map 20. It may have been damaged or disrupted by the previous clear-cut logging and the establishment of the shooting range. The temporarily flooded area shown on the National Wetlands Inventory may be evidence of this intermittent stream. (See National Wetlands INventory detail, Mathews County Tax map composite, and National Map Hydro-Imagery detail.)

C1. Sponsor states the site creates/contributes to a corridor linking large aquatic systems.

  • The property is separated from the East River by 93 acres in 12 adjacent parcels of land. See List of Properties and Tax Map Composite.

C5. Sponsor states the site will contribute to improved water quality for identified/ designated impaired waters described as “shellfish/not supporting.”

  • In spite of previous improper farming practices referred to in the prospectus as contributing sediment and nutrients to the East River, the Virginia Department of Environmental Quality reports no East River nutrient or sediment impairments.
  • The shellfish impairment is for E. coli. Reducing flow of precipitation runoff to the East River will not reduce E. coli levels in the river.

C8. Sponsor states the proposed site is “at the top of the watershed.”

  • The site is at least 1 mile south of the ridge separating the East River Watershed HUC12-020801020405 from the Lower Piankatank River Watershed HUC12-020801020403. Virginia Department of Transportation project plans for Route 14, 14-667C, sheet 7, show two notations of 600 and 675 acres of drainage being carried across the road from the northwest to the East River just west of the proposed mitigation site. See National Map watershed boundary detail below.

    Watershed Boundaries in purple from National Map. (Color enhanced for better visibility.)

    Watershed Boundaries in purple from National Map. (Color enhanced for better visibility.)

Yellow arrows placed on National Wetlands Inventory map show runoff channels  crossing Honey Pod Lane from proposed site.

Yellow arrows placed on National Wetlands Inventory map show runoff channels crossing Honey Pod Lane from proposed site.

FEMA Flood Hazard Map Layer showing proposed site is in Zone X.

FEMA Flood Hazard Map Layer showing proposed site is in Zone X.

Properties Between Proposed Site (tax map 20-A-1) and East River (see Tax Map below list)

Adjacent waterfront properties with residences:
19-A-98   29.40 acres   166 Honey Pod Lane (Norton) (Under construction.)
19-A-99A   5.06 acres   366 Honey Pod Lane   (Hurst)
19-A-99   27.37 acres   524 Honey Pod Lane   (Walsh)
20-A-1A     6.93 acres   620 Honey Pod Lane   (Hudgins)
20-A-1B     5.35 acres   652 Honey Pod Lane   (Hurst)

Adjacent non-waterfront with residence:
20-A-5 1.24 acres   755 Honey Pod Lane (Jenkins)

Adjacent non-waterfront properties with no residences:
20-A-1D 0.07 acres (Walsh)
20-A-3     2.03 acres (Ingram, C.)
20-A-4     0.71 acres (Jenkins)

Parcels between adjacent properties and East River
20-A-1C (Waterfront with residence) 4.00 acres 674 Honey Pod Lane (Owens)
20-A-6 (Non-waterfront, no residence) 1.01 acre (Ingram, C.)
20-A-7 (Waterfront, no residence) 10.06 acres (Ingram, A.)

Total 93.23 acres between site and river.

Adjacent to eastern property border
20-A-2   54.30 acres (Gayle) Along eastern ditch.

Composite of Mathews County tax maps 15, 19 and 20 to show proposed site and adjacent properties.

Composite of Mathews County tax maps 15, 19 and 20 to show proposed site and adjacent properties. Intermittent stream is solid light line between Honey Pod Lane and double-circle A.

Comprehensive Plan map showing West Mathews Future Land Use.

Comprehensive Plan map showing West Mathews Future Land Use.

Mathews County Comprehensive Plan showing West Mathews Chesapeake Bay Protection Areas. RMA on proposed site circled in red.

Mathews County Comprehensive Plan showing West Mathews Chesapeake Bay Protection Areas. RMA on proposed site circled in red.

National Map Hydrography view showing intermittent stream on proposed site and East River.

National Map Hydrography view showing intermittent stream on proposed site and East River.